![](http://www.planurba.es/wp-content/uploads/2019/09/web-PLUS-05-v-fuentiduena.jpg)
Fuentidueña, Alcalá de Henares.
Characterisation from the environmental and social-economic perspective of the scope of the study with which it is expected to build the Fuentidueña de Tajo bypass between the M-326 and M-831 roads.
Characterisation from the environmental and social-economic perspective of the scope of the study with which it is expected to build the Fuentidueña de Tajo bypass between the M-326 and M-831 roads.